OJSC POWER MACHINES IS MANUFACTURING THE POWER EQUIPMENT FOR THE FIRST NPP UNDER CONSTRUCTION IN BELARUS
The deaerator manufactured by TKZ Krasny Kotelshchik (is a part of Power Machines), which shall be installed at the NPP Unit 1, is shipped to the Consumer. The low pressure heaters are shipped to the NPP in parallel with the deaerator. The Unit 1 condenser group is mounted at the NPP site under the guidance…